Conduit lines

Need to provision for:

  • Main panel to subpanel
  • Subpanel to thermostat, thermostat to heater
  • Bank of lines from subpanel to appliance control center
  • Eventual line from subpanel to secondary AC
  • Appliance control to chiller in basement
  • Appliance control to appliances on laser wall shelves
  • Speed control for ventilation
  • Speed control for ceiling fan
  • Subpanel to quad boxes with 20A 120v outlets for:
    • Power supplies, laptop, computer etc near laser
    • Nest area
    • Storage room
    • Big screen tv
    • …the rest of the studio
    • laser_wall3
      That is a lotta pipe. Dont criss-cross any of the conduit, make sure there is clearance around the sewage vent pipe and keep the water lines below all electrical lines.

      Whoa man: what if you have to add customized lighting for particular areas?

      Advertisements

    Leave a Reply

    Fill in your details below or click an icon to log in:

    WordPress.com Logo

    You are commenting using your WordPress.com account. Log Out / Change )

    Twitter picture

    You are commenting using your Twitter account. Log Out / Change )

    Facebook photo

    You are commenting using your Facebook account. Log Out / Change )

    Google+ photo

    You are commenting using your Google+ account. Log Out / Change )

    Connecting to %s


    %d bloggers like this: